Western Villages, Granton

Western Villages is Scotland’s largest ‘Net Zero Carbon’ housing development and forms a major part of one of Europe’s largest, housing-led regeneration projects.

Located in Granton, North Edinburgh, Western Villages comprises a total of 444 one, two, and three-bedroom homes that are being led by Main Contractor CCG (Scotland) on behalf of the City of Edinburgh Council.

The development is being created as part of the Granton Waterfront Regeneration Framework, which is one of the largest of its kind under construction in the UK, consisting of 3500 net zero homes over the next 10 years and playing a major part in the Council’s strategic housebuilding programme to deliver 20,000 homes by 2035.

To achieve net zero, the development utilises a combination of a bespoke-designed energy strategy and homes that emphasise enhanced fabric performance to minimise heat loss and emissions associated with regulated operational energy use. Entirely non-gas, the heating system consists of a cASHP system delivered via an on-site energy system with a sophisticated network of pipes connecting to the homes to enable heating and hot water services. Solar PV is also installed on the roof of each flatted block, with any remaining carbon offset by various measures.

Arc-Tech MU have thus far supported an enabling works package that enabled construction to start in mid-2022 with all homes set to be complete by mid 2025.  Our Service package includes:

Water

  • Design Approval for new Water mains and services
  • Supply and installation of 610m of mains water pipework
  • Supply and installation of 10No 63mm water services
  • Test and Chlorination of newly installed Water mains
  • Supply and installation of external boosted water pipework

Electrical

  • Design approval for new Electric mains and services
  • Divert the existing DNO HV mains cable out with the proposed development boundary including all associated civils works
  • Liaise with DNO and complete HV connections onto existing DNO electrical network
  • Supply and installation of new HV mains cabling and circa 2,058m of LV mains cabling
  • Supply and installation of 31No MSDB boards within each block stairwell
  • Supply and installation of 444No plot electrical services
  • Supply and installation of 31No 3-phase landlord supplies
  • Supply and installation of 2No packaged substation units
  • Supply and installation of 4No Temporary supplies to support construction works

Client:
The City of Edinburgh Council

< back
Find out more about our pioneering projects
View our Case Studies
FaceBookTwitterLinkedIn
  • Privacy & Cookies
  • Site Terms
Copyright © 2026 Arc-Tech MU Ltd. All rights reserved. Website by reflexblue.
Accreditation NERSAccreditation WIRSAccreditation GIRS